Docks and Harbor Engineering

As compared to wall type breakwater, mound type breakwater_____.

  • A. Requires skilled labor
  • B. Requires low maintenance cost
  • C. Requires less material
  • D. Results in less damage due to gradual failure
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!