Irrigation Engineering

Borrow pits should preferably be located in

  • A. Field on the left side of the canal
  • B. Field on the right side of the canal
  • C. Fields on both sides of the canal
  • D. Central half width of the section of the canal
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!