Chemical Engineering Basics

Cascade control is

  • A. The continuous adjustment of the set point index of an automatic control loop by a primary (master) controller
  • B. Used when changes in process conditions cause serious upsets in the controlled variable
  • C. Useful to control flow from temperature
  • D. All of the above
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
error: Alert: Content is protected !!