- A. Collapsible gates with rails
- B. Rolling shutters
- C. Expanded metal wire netting
- D. M.S. reinforcement of R.C.C. works
Estimating and Costing
-
The unit of measurement is per quintal for the following:
-
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is_____.
- A. 1.00 m³
- B. 1.25 m³
- C. 1.50 m³
- D. 1.75 m³
-
The height of the sink of wash basin above floor level is kept_____.
- A. 60 cm
- B. 70 cm
- C. 75 cm to 80 cm
- D. 80 cm
-
Pick up the correct statement regarding the centre line method of estimating a building_____.
- A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
- B. The centre line is worked out separately for different sections of walls of a building
- C. The centre line length is reduced by half the layer of main wall joining the partition wall
- D. All the above
-
Referring of given figure, pick up the correct statement from the following:
- A. The total length of centre line of four walls is 20 m
- B. Length of long wall out-to-out is 6.80 m
- C. Length of short walls in-to-in is 3.20 m
- D. All the above
-
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is_____.
- A. 0.200 m³
- B. 0.247 m³
- C. 0.274 m³
- D. 0.295 m³
-
Pick up the correct statement from the following:
- A. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies
- B. Additional supervising staff engaged at work site, is called work charged establishment
- C. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item
- D. All the above
-
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_____.
- A. 0.90 m³
- B. 0.94 m³
- C. 0.98 m³
- D. 1.00 m³
-
Pick up the correct statement from the following:
- A. The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value
- B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost
- C. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval
- D. All the above
-
The measurement is not made in square meters in case of_____.
- A. D.P.C. (Damp proof course)
- B. Form works
- C. Concrete Jeffries
- D. R.C. Chhajja