Tunnel Engineering

Circular section of tunnels is not suitable for_____.

  • A. Carrying water
  • B. Non-cohesive soils
  • C. Tunnels driven by shield method
  • D. Placement of concrete lining
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!