By removing the loose concrete, the repair and rehabilitation of damaged or spalled concrete is done. Temporary support is provided to the girder to relieve dead load stresses and the case of pretressed concrete bridge decks, special stress check up is essential before starting the repair works.
If a paint is applied excessively thick then wrinkling occurs. Grinning occurs when under coat and final coat are of different colours. Running occurs if the surface is too smooth; paint run off from such parts. Flaking occurs due to poor adhesion, leading to peeling off of paint.
Barins snooper vehicle is used to inspect in case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to watery situation. The snooper is mounted on a heavy duty truck with a swiveling platform and the underside of the bridge deck can be inspected by using the hydraulically operated platform.
IS 6313 part I and II gives detail about termite treatment. Wood, plastic, leather and rubber can be attacked by termite. Anti termite protection is therefore used.