A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 %
Home/Civil Engineering (MCQs)/Estimating and Costing/Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds A. 2.0 % B. 2.5 % C. 4.0 % D. 5.0 % Answer: Option D. Explanation: No answer description available for this question. Show AnswerDiscussion