A. 1/15th of span B. 1/20th of span C. 1/25th of span D. 1/30th of span
Home/Civil Engineering (MCQs)/RCC Structures Design/For initial estimate for a beam design, the width is assumed_____. RCC Structures Design For initial estimate for a beam design, the width is assumed_____. A. 1/15th of span B. 1/20th of span C. 1/25th of span D. 1/30th of span Answer: Option D. Explanation: No answer description available for this question. Show AnswerDiscussion