Waste Water Engineering

For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of

  • A. 100 cm
  • B. 120 cm
  • C. 140 cm
  • D. 160 cm
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!