Tunnel Engineering

Forepoling method is generally adopted for tunnelling in:

  • A. Soft ground
  • B. Firm ground
  • C. Running ground
  • D. None of these
Answer: Option A.
Explanation: 

IS 14665 gives details about elevators. It specifies the number, capacityof elevator and number of floors to be served.

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
error: Alert: Content is protected !!