Irrigation Engineering

If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be

  • A. aqueduct
  • B. superpassage
  • C. syphon
  • D. syphon aqueduct
Answer: Option A.
Explanation: 

No answer description available for this question.