A. 0.5 m/sec B. 1 m/sec C. 1.5 m/sec D. 2 m/sec
Home/Civil Engineering (MCQs)/Irrigation Engineering/In a concrete canal the approximate permissible velocity of water should not exceed Irrigation Engineering In a concrete canal the approximate permissible velocity of water should not exceed A. 0.5 m/sec B. 1 m/sec C. 1.5 m/sec D. 2 m/sec Answer: Option D. Explanation: No answer description available for this question. Show AnswerDiscussion