Waste Water Engineering

In a grit chamber of a sewage treatment plant,

  • A. Flow velocity 0.15 m to 0.3 m/sec is kept
  • B. Depth of 0.9 m to 1.20 m is kept
  • C. One minute of detention period is kept
  • D. All the above
Answer: Option D.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!