A. 10.0 B. 5.0 C. 2.0 D. 0.25
Home/Civil Engineering (MCQs)/Waste Water Engineering/In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept_____. Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept_____. A. 10.0 B. 5.0 C. 2.0 D. 0.25 Answer: Option D. Explanation: No answer description available for this question. Show AnswerDiscussion