A. 1 B. 5 C. 10 D. 30
Home/Chemical Engineering (MCQs)/Chemical Engineering Plant Economics/Maximum production start up cost for making a chemical plant operational is about _____ percent of the fixed capital cost. Chemical Engineering Plant Economics Maximum production start up cost for making a chemical plant operational is about _____ percent of the fixed capital cost. A. 1 B. 5 C. 10 D. 30 Answer: Option C. Explanation: No answer description available for this question Show AnswerDiscussion