Chemical Engineering Plant Economics (MCQs)

Maximum production start up cost for making a chemical plant operational is about __________ percent of the fixed capital cost.

  • A. 1
  • B. 5
  • C. 10
  • D. 30
Answer: Option C.
Explanation: 

No answer description available for this question

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
error: Alert: Content is protected !!