- A. Once through project
- B. Maintenance jobs
- C. Research and development
- D. All of the above
Industrial Engineering and Production Management
-
PERT/CPM, techniques can be used for following applications_____.
-
Scheduling gives information about_____.
- A. When work should start and how much work should be completed during a certain period
- B. When work should complete
- C. That how idle time can be minimized
- D. Proper utilization of machines
-
‘O’ on a PERT/CPM chart represents_____.
- A. An ordinary event
- B. A significant event representing some milestone
- C. An event to be transferred to other network chart
- D. Dangling event
-
The determination of standard time in a complex job system is best done through_____.
- A. Stop watch time study
- B. Analysis of micro-motions
- C. Grouping timing technique
- D. Analysis of standard data system
-
The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as_____.
- A. Job enlargement
- B. Job enrichment
- C. Job rotation
- D. Job evaluation
-
The deductions for, employees provident fund start_____.
- A. Immediately on joining the service
- B. After 60 days of joining the service
- C. After 100 days of joining the service
- D. After 240 days of joining the service
-
In PERT analysis, critical path is obtained by joining events having_____.
- A. +ve slack
- B. -ve slack
- C. Zero slack
- D. Dummy activities
-
The most popular type of organisation used for Civil Engineering Constructions is_____.
- A. Line organization
- B. Line and staff organization
- C. Functional organization
- D. Effective organization
-
Product layout is best suited where_____.
- A. One type of product is produced
- B. Product is standardized
- C. Product is manufactured in large quantities
- D. All of the above
-
Works cost implies_____.
- A. Primary cost
- B. Factory cost
- C. Factory expenses
- D. Primary cost + factory expenses