Pick up the correct statement from the following:

  • A. The maximum rate of storm runoff is called peak drainage discharge
  • B. Rational method of estimating peak run off, may be used precisely for areas less than 50 hectares
  • C. The period after which the entire area starts contributing to the runoff, is called the time of concentration
  • D. All the above
Answer: Option D.
Explanation: 

No answer description available for this question.