Irrigation Engineering

The net head under which the turbine reaches its peak efficiency at synchronous speed is called

  • A. design head
  • B. rated head
  • C. gross head
  • D. operating head
Answer: Option A.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!