RCC Structures Design

The toe projection of foundation slabs is taken_____.

  • A. As one third of the base
  • B. As one sixth of overall height of the wall
  • C. Equal to heel slab
  • D. Below ground surface
Answer: Option A.
Explanation:

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!