RCC Structures Design

Though the effective depth of a T-beam is the distance between the top compression edge to the centre of the tensile reinforcement, for heavy loads, it is taken as_____.

  • A. 1/8th of the span
  • B. 1/10th of the span
  • C. 1/12th of the span
  • D. 1/16th of the span
Answer: Option C.
Explanation:

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!