Waste Water Engineering

You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at

  • A. Full depth
  • B. Half full
  • C. Two third full
  • D. Three fourth full
Answer: Option C.
Explanation: 

No answer description available for this question.

Leave a Reply

Your email address will not be published.

Back to top button
error: Alert: Content is protected !!